What to Specify Before the Drywall Goes Up (So a New Build Doesn't Feel Like a Spec House)

A new house in West Palm Beach can be well built and still feel like a spec house.

The rooms are the right size. The kitchen works. And yet nothing quite belongs to the people who will live there: the outlets sit in the obvious places, the lighting is an even grid of recessed cans, the bath niche is a leftover square, and the door hardware looks as if it was chosen from a box in the trailer. That is not usually a failure of the builder. It is what happens when the finish decisions arrive after the walls are already closed.

The work that keeps a new build from feeling generic is mostly decided before the drywall goes up. Blocking, the lighting plan, outlet locations, plumbing valves and finishes, niche placement, and hardware: these are the things I want on a drawing while we can still move them. After the walls are finished, every change is a patch and a compromise.

Start with a finish schedule, not a furniture plan

Furniture comes later. What I want first is a clear finish and fixture schedule tied to the construction drawings: where the light goes, where the water comes out of the wall, what the door is doing, and what needs to be solid behind the drywall.

I work alongside your builder, GC, and architect. I do not replace them. I issue the kind of information the field can use: locations, dimensions, and product cuts, so the house is framed and roughed in for the home you actually want, not for a generic version of it.

Blocking: the structure you never see

If a wall is going to hold something heavy or something exact, it needs blocking while the framing is open.

That includes a wall-mounted vanity or a medicine cabinet, a television or a floating shelf, wall sconces, a drapery or shade pocket, a solid brass door-stop or a grab bar, and any millwork that will be screwed into a precise line. Without blocking, we are later hunting for a stud or using a weaker anchor, and the sconce ends up an inch off the tile joint.

I like to walk the rooms with the drawings and mark these locations before the walls close.

A lighting plan, not only recessed cans

Recessed lighting has a place. A ceiling of equally spaced cans, and nothing else, is how a lot of new houses end up feeling flat.

Before drywall, I want a layered lighting plan: overhead light where it is useful, wall light at the human scale, and task light where you cook, read, or dress. That might be a pendant sized in inches and hung over an island, an alabaster or soft-brass sconce at a vanity or a bed, or a monopoint or flush mount in a low hallway. Dimming should be decided with the switching, not added later as a hope.

This is also when I plan the lighting that has to be wired and blocked before the walls close: LED shelf lighting in wall units and built-ins, decorative light strips, under-cabinet lighting, hallway floor lights, and picture lights for artwork. If those are not in the drawings now, we are cutting into finished walls later to add them.

This is the moment for shade pockets and for any ceiling detail that will hide a drapery track. If a woven-wood shade or an automated shade is going to recess cleanly, the pocket has to be in the framing. You cannot easily invent that after the drywall is hung and the plaster or paint is on.

Outlets, switches, and the little covers people forget

Outlet placement is one of those subjects that sounds minor until you live with it.

I want outlets where lamps, beds, desks, and kitchen appliances will actually go, including inside millwork and, sometimes, in the floor, rather than in a default pattern along the baseboard. Some outlets go horizontal, especially in the kitchen. Some go inside drawers in custom bathroom vanities, or inside a coffee bar station. In the bedroom, I hide outlets behind the nightstands, not above them, and sometimes inside the nightstand drawer. In the bathroom vanity I add extra outlets, because women like to plug in hair tools and toothbrushes.

There is also the look of the device itself. A flush-mounted slab outlet, or a cover color-matched to the paint, plaster, or paper, is a small thing that makes a wall feel finished. Those products have to be chosen and roughed in while the box can still be set to the right depth.

Plumbing valves and finishes

The faucet you fall in love with has a rough-in. If we do not plan for it now, we are stuck with a deck-mounted lavatory when you wanted a wall-mounted or bridge-mounted faucet, or with a tub that cannot accept an exposed floor-mounted filler with a handshower.

Before the walls close, I want the valve locations, mounting heights, and spout positions on the drawing, coordinated with the actual fittings, not a generic "bath faucet" that we swap later. Finish can often be confirmed a little later than location, but the type of mount cannot. A wall-mounted articulated pot filler, a particular shower system, or a filler that comes up through the floor all have framing and plumbing consequences.

I also want the shower and bath valves in a place a person can reach, not behind a door swing. This is coordination with your plumber and your builder, and it is much cheaper to get right in the rough-in than to move after tile.

Niche placement

A niche is not leftover space. It is a small piece of architecture. In a shower, I make niches large enough that you never crowd your items.

I have two go-to approaches. One is a horizontal niche on the main or long wall, decorative and meant to be seen, lined up with the grout or the stone. The other is hidden behind a quarter wall: a long niche with many shelves, stopping at the bench. A default square cut wherever the studs happened to allow it is one of the quickest ways a new bath looks generic.

Two shower niche styles: a stacked shelf niche that stops at the bench, and a decorative horizontal niche with an LED strip. Drawn by Emily Krug.

Hardware, while the door is still on the drawing

Door hardware is easier to get right when the door thickness, the hinge, and the lockset are decided together, before the door is ordered and the jamb is done.

I like solid brass door handles, and I am specific about the finish: unlacquered brass as a living finish if the client wants it to change, especially away from the most salt-exposed openings; a lacquered or more stable brass where they want less upkeep; and marine-grade 316 stainless or a carefully chosen alternative closer to a pool or a terrace door, where salt air is harder on some finishes. Concealed hinges or a decorative exposed hinge should be a decision, not a leftover.

Cabinet hardware can often be chosen later than door hardware, but the door itself cannot.

When to bring me in

If the walls are about to close and none of this has been drawn, we can still do something, but we will have less room to move. The better moment is while the house is being designed or framed, when a lighting plan and a finish schedule can still change the rough-in.

You can read more about renovations and new-build services, working with me, and rooms in the portfolio. I also write about the materials themselves, including kitchen counters and flooring, because those choices often have to be made on the same calendar.

If you are in the middle of a new build, or about to start one, book a free 30-minute discovery call. Send the plans and a few photos of the site or the model if you have them. The call is free. If we continue, I work at $150 an hour, and this is exactly the kind of work that hour is for.

Frequently asked questions

When should I hire an interior designer for a new build in Florida?

Early enough that lighting, plumbing, outlets, blocking, shower niches, and hardware can still go into the drawings. Once the drywall is up, we are decorating around decisions that have already been made.

Do I still need a designer if I already have a builder?

Often yes, for a different part of the work. The builder is constructing the house. I help decide what the house is being built to receive, and I coordinate those details with the builder, the GC, and the architect.

Can these decisions wait until we pick furniture?

Some furniture can wait. The blocking, the lighting in built-ins, the outlets, the valves, and the door hardware should not. I hide bedroom outlets behind the nightstands, or sometimes inside the nightstand drawer, and that only works if we plan it before the walls close.

How do you design a shower niche?

I make them large enough that you never crowd your items. I have two go-tos: a horizontal niche on the main or long wall, decorative and meant to be seen, and one hidden behind a quarter wall, long with many shelves, stopping at the bench. Both have to be framed before drywall.

What should I bring to a discovery call about a new build?

Plans if you have them, a finish list if the builder has already issued one, and any photos or examples of rooms you like. Even an early set of drawings is enough to have a useful conversation.